{"id":38,"date":"2025-04-15T09:20:26","date_gmt":"2025-04-15T01:20:26","guid":{"rendered":"https:\/\/www.sinomegasteelstructure.com\/?post_type=news&#038;p=38"},"modified":"2025-12-11T15:08:52","modified_gmt":"2025-12-11T07:08:52","slug":"participer-a-lexposition-philippine-worldbex-pour-etendre-les-possibilites-de-cooperation-3","status":"publish","type":"news","link":"https:\/\/www.sinomegasteelstructure.com\/fr\/nouvelles\/participer-a-lexposition-philippine-worldbex-pour-etendre-les-possibilites-de-cooperation-3\/","title":{"rendered":"Projet d'h\u00f4pital \u00e0 structure m\u00e9tallique aux Philippines"},"content":{"rendered":"<p>En juillet 2025, le projet d'h\u00f4pital \u00e0 structure m\u00e9tallique de cinq \u00e9tages de Sinomega aux Philippines est arriv\u00e9 \u00e0 mi-parcours. Afin de garantir le bon d\u00e9roulement et la qualit\u00e9 du projet, notre directeur commercial et nos experts techniques sont arriv\u00e9s r\u00e9cemment sur place pour inspecter la construction, r\u00e9soudre les principaux probl\u00e8mes techniques et aider l'\u00e9quipe \u00e0 maintenir un calendrier efficace et ordonn\u00e9.<br \/>\nCe projet, en tant qu'\u00e9tablissement de sant\u00e9 local de premier plan, adopte un syst\u00e8me de structure m\u00e9tallique de haut niveau pr\u00e9sentant des avantages tels que la r\u00e9sistance aux tremblements de terre, la protection contre la corrosion et la rapidit\u00e9 de construction. L'\u00e9quipe sur place suit rigoureusement des proc\u00e9dures de gestion normalis\u00e9es pour garantir la qualit\u00e9, la s\u00e9curit\u00e9 et l'efficacit\u00e9.<\/p>\n<p>Sinomega reste attach\u00e9e au professionnalisme, \u00e0 l'efficacit\u00e9 et \u00e0 la responsabilit\u00e9, et continuera \u00e0 contribuer au d\u00e9veloppement de l'infrastructure des soins de sant\u00e9 aux Philippines gr\u00e2ce \u00e0 une ex\u00e9cution de qualit\u00e9 et \u00e0 un service fiable.<\/p>","protected":false},"excerpt":{"rendered":"<p>In July 2025, Sinomega\u2019s five-story steel-structure hospital project in the Philippines has reached the halfway point. To ensure the smooth progress and high quality of the project, our business manager and technical experts have recently arrived on-site to inspect the construction, address key technical issues, and support the team in maintaining an efficient and orderly [&hellip;]<\/p>","protected":false},"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","class_list":["post-38","news","type-news","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.sinomegasteelstructure.com\/fr\/wp-json\/wp\/v2\/news\/38","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sinomegasteelstructure.com\/fr\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.sinomegasteelstructure.com\/fr\/wp-json\/wp\/v2\/types\/news"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sinomegasteelstructure.com\/fr\/wp-json\/wp\/v2\/comments?post=38"}],"wp:attachment":[{"href":"https:\/\/www.sinomegasteelstructure.com\/fr\/wp-json\/wp\/v2\/media?parent=38"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}